Addendum to Modification Notice dated 26.02.21 - Modification of a contract/concession during its term
Call off Contract for the Construction of Multi-Storey Car Park, Gateshead under Scape Procure national Construction Framework (Lot 1)
Main CPV code: 45213312-3-Car Park Building Construction Work
Place of performance NUTS Code: UKC22
Description of the procurement at the time of conclusion of the contract:
Call off for construction services for the design and construction of a multi-storey car in Gateshead, Tyne and Wear under the National Construction Framework Agreement between Scape Procure Limited and Willmott Dixon Construction Limited (Lot 1)
Details of modifications to the Works Information in respect to the Call off Contract between The Borough Council of Gateshead and Willmott Dixon Construction Limited.
Following the award of the call-off Contract the Contract Value has increased due to changes to the design and specification arising from site surveys results, planning requirements, climate change methods and statutory requirements, as the project moved through the RIBA stages of construction.
These include the following:
- Increase in number of EV charging points from 45 to 50
- Increase the number of lifts required from 4 to 6 due to the increase in numbers of persons/car
- Introduction of waterproof paint finish to the concrete floors to each of the internal levels
- Introduction of external covered cycle storage
- Provision of PV to the top deck by way of retrofitted canopies and without introducing another structural deck
- Increase in width of East/West road from 2 to 3 lanes
- Provision of Sprinkler system
- Addition of Ventilation to escape stairs as a result of increasing the anticipated number of passengers per car
- The need for additional retaining walls to MSCP site
- Resetting of the north east entrance core ensuring provision of level access to North South road -
- Option for changing the structural downstand beams to cellform/castellated
- Addition of Mine grouting
- Inclusion of Pumping for Surface Water drainage
- Option for alternative 3D perforated cladding panels